Opening Checklist
Your complete morning routine for getting Muse & Co ready to welcome guests. Arrive 30 minutes before open (10:30 AM) to give yourself enough time.
Timing Matters
The espresso machine needs 15-20 minutes to warm up and boba pearls take 25-30 minutes to cook. Start both of these first, then handle everything else while they're running.
Hours Reference
| Day | Hours |
|---|---|
| Monday | Closed (private events only) |
| Tuesday - Friday | 11:00 AM - 7:00 PM |
| Saturday - Sunday | 11:00 AM - 8:00 PM |
Opening Procedure
1. Arrival and Startup (10:30 AM)
- [ ] Arrive at the shop by 10:30 AM
- [ ] Unlock the front door (keep it locked — do not open to the public yet)
- [ ] Turn on all interior lights
- [ ] Turn on the espresso machine and let it warm up (15-20 min)
- [ ] Turn on the hot water dispenser
- [ ] Check the water filtration system — make sure it is running properly and filters are not overdue
2. Boba and Tea Prep (start by 10:35 AM)
- [ ] Start cooking boba pearls (25-30 min process — follow the posted boba recipe)
- [ ] Brew base teas (black tea, green tea, oolong — whatever is needed for the day)
- [ ] Prep fruit tea ingredients — slice fresh fruit, check syrup levels, refill as needed
- [ ] Check milk and cream stock in the fridge
- [ ] Verify all drink ingredients are stocked and accessible
Boba Timing
Boba pearls are only good for 4 hours after cooking. If you expect a slow day, consider cooking a smaller batch and making a second batch later. Do not cook boba before 10:30 AM — they will expire before close.
3. Clean and Set Up the Space
- [ ] Wipe down all counters and the drink prep area
- [ ] Clean and organize the seating area — straighten chairs and tables
- [ ] Check restroom: stocked with soap, paper towels, and toilet paper; clean and presentable
- [ ] Ensure display cases are clean and merchandise is neatly arranged
4. Stock Supplies
- [ ] Stock cups (all sizes)
- [ ] Stock lids and dome lids
- [ ] Stock straws (regular and boba-width)
- [ ] Stock napkins
- [ ] Stock to-go bags
- [ ] Refill straw and napkin dispensers in the customer area
5. POS and Cash Drawer
- [ ] Count the cash drawer and verify it matches the expected starting amount
- [ ] Log into the POS system at staff.ncmuse.co/pos
- [ ] Make sure the card reader is connected and responsive
- [ ] Do a test transaction if anything seems off
Cash Discrepancy
If the cash drawer count does not match the expected amount, note the difference and contact the manager at hello@ncmuse.co before opening. Do not adjust the count without approval.
6. Check the Day's Schedule
- [ ] Review the event schedule for the day
- [ ] If Paint & Boba or Sit and Paint is scheduled:
- [ ] Set out easels and canvases at the designated tables
- [ ] Lay out paint supplies (brushes, palettes, water cups, aprons)
- [ ] Cover tables with protective coverings
- [ ] If a private event is booked (Mondays or after hours), review the event details so you are prepared
7. Final Check and Open
- [ ] Verify the espresso machine is fully warmed up and ready
- [ ] Confirm boba pearls are cooked and sitting in sugar syrup
- [ ] Do a quick walkthrough: everything looks clean, stocked, and inviting
- [ ] Turn on any music or ambient sound
- [ ] Unlock the front door at opening time (11:00 AM)
Quick Reference
| Task | Time Needed | Start By |
|---|---|---|
| Espresso machine warmup | 15-20 min | 10:30 AM |
| Boba pearl cooking | 25-30 min | 10:35 AM |
| Tea brewing | 10-15 min | 10:35 AM |
| Cleaning and stocking | 15-20 min | 10:40 AM |
| POS and cash count | 5 min | 10:50 AM |
| Final walkthrough | 5 min | 10:55 AM |
Last updated: March 2026
